IoTSec:Consortium meeting Jun2016
From its-wiki.no
Security in IoT for Smart Grids | |||||||
---|---|---|---|---|---|---|---|
|
IoTSec:Consortium meeting Jun2016
Title | IoTSec:Consortium meeting Jun2016 |
---|---|
Place | NTNU i Gjøvik |
Date, Time | 2016/06/09, 09:30-17:00h |
Contact Person | Einar Snekkenes |
Participants | Cristian Johansen, Einar Snekkenes, Habtamu Abie, Heidi Tuiskula, Josef Noll, Olaf Owe, Seraj Fayyad, Stian Løvold, Yan Zhang, Toktam Ramezanifarkhani, Gard Støe Valla, Ivar Rummelhoff, Ming-Chang (Leo) Lee, Sigurd Eskeland, Kaniz Fatema Tuly, Håkon Duus, Adam Szekeres |
related to Project | IoTSec |
Keywords |
this page was created by Special:FormEdit/Meeting, and can be edited by Special:FormEdit/Meeting/IoTSec:Consortium meeting Jun2016 |
Category:Meeting |
Venue
- Address: Ørneredet - on the top floor of the G building, NTNU i Gjøvik. Teknologiveien 22, 28 15 Gjøvik.
Travel...Transport from Oslo
- (trains from Oslo 07:02, From Gjøvik 17:29)
- A maxi taxi will pick you up from the train station and take you to the train station when the meeting is finished.
Agenda
- 09.30 Welcome & introduction of participants
- ongoing discussions
- 10.00 Action items
- 10.30 Coffe/Tea/Snacks
- 10.45 Smartnett i Eidsiva Nett: AMS og informasjonssikkerhet - Gard Støe Valla, Fagansvarlig IKT i Eidsiva Nett.
- 12.00 -13.00 Lunch
- 13.00 Status/Results/Plans/Discussion WP 1
- 13.45 Status/Results/Plans/Discussion WP 2
- 14.30 Coffe/Tea/Snacks
- 14.45 Status/Results/Plans/Discussion WP 3
- 15.30 Status/Results/Plans/Discussion WP 4
- 16.15 Summary/conclusions
- 16.30 Taxi waiting
Minutes
- Participants listed in the header
- Open Action items, see IoTSec:ActionItems
Smartnett i Eidsiva Nett: AMS og informasjonssikkerhet
About Eidsiva Nett, presented by Gard Støe Valla, Fagansvarlig IKT i Eidsiva Nett
‘’Note: private notes taken by Josef
- 5. biggest in Norway,
- producing roughly 7.5 TWh through 20 (fully owned) + 25 (partly owned) power stations
- supporting 23.000 km of power grid and roughly 155.000 households
Security challenges - measures taken at substations
- consumption
- voltage
- ground fault
- short circuit
- switch position
- open door
- humidity
- temperature
Used for handling of alarms: event > AMI > filtering > alarm > analysis > action
Security standards implemented by Eidsiva
- standardised security requirements (harmonised with Agder Energi and BKK)
- separate functions
- HAN port (one way)
- not integrated AMS with DMS/SCADA
- circuit breaker (only single command, no group break)
- Infrastructure
- Firewall, IDS, logging, events, mirrored sites
- focus on backup/roll-back
- hardening of the system
- user management/access control
- encryption and whitelisting
- Use of experts
- audits, revisions
- surveillance
- PEN-testing (on whole system)
- risk & vulnerability analysis (ROS-analyse)
- People
- policies, knowledge and awareness
- Privacy
- personal information
- storage/deletion
- aggregation
About soft fuses and the relation to the smart grid regulations of Norway. ‘’Note: the smart grid regulations in Norway indicated that the smart meters should be able to throttle the max power in the meter’’.
- new Ailon equipment have a hard switch with software-defined level, e.g. 6 kW max usage. Higher usage than this 6 kW will switch-off the power supply.
- physical interaction with the meter is needed to switch the AMS back to operation
- Discussion: future AMR will have a soft-switch
Media:201606SmartGrid_Challenges_Gard_Eidsiva.pdf
Workpackages
IoTSec:WP1
According to plans
- need Semantic model for infrastructures
- Media:201606ABS_Modelling_of_AMR_Leo.pdf
IoTSec:WP2
According to plans
IoTSec:WP3
- According to plans
- Nice presentation from Adam Media:201606Risk_Analysis_for_Smar_Metering_Adam.pdf
- CIRA method - Conflict Incentives Risk Analysis
- Value Chain for the Smart Metere as a case study
IoTSec:WP4
Smart Grid Security Centre: Håkon and David have taken responsibility for roadmap
- three bullet points on main Security challenges for DSOs
- roadmap for launch (ideas > video > partners(?) > launch event > ...)
- For D4.2.1 outline of the Security Centre maybe the deadline is too small
Conclusions/Next Meeting
Next meetings
- WP1/WP2 work meeting
- Smart Grid Security Center - meeting
- IoTSec meeting
Open topics
- check security requirements from Eidsiva with Fredrikstad Energi, EB Nett++
- get an idea of roadmap for IoT-based information in distribution networks
- continue the good work in science
- relation to national and EU projects and clusters
Registration form
# | Participant | Affiliation | Comments |
---|---|---|---|
01 | Josef Noll | UiO | No meat |
02 | Christian Johansen | UiO | Vegetarian |
03 | Heidi Tuiskula | NCE Smart | |
04 | Seraj Fayyad | Movation | No meat |
05 | Yan Zhang | Simula | |
06 | Ivar Rummelhoff | NR | |
07 | Ming-Chang Lee | UiO and Simula | |
08 | Habtamu Abie | NR | No Lactose |
09 | Sigurd Eskeland | NR | |
10 | Toktam Ramezanifarkhani | UiO | vegetarian |
11 | Stian Løvold | UNIK | |
12 | Einar Snekkenes | NTNU | |
13 | Olaf Owe | IFI | |
14 | Kaniz Fatema Tuly | NTNU Student | No food |
0x | n.n. | Partner | |
0x | n.n. | Partner | |
0x | n.n. | Partner |