T0.2 | Dissemination, Scientific Papers, workshops, liaisons, industrial take-up | | |
T1.1 | Semantic description of infrastructure, attack detection, system view | | |
T1.2 | Measurable: security, privacy and dependability, metrics | | |
T2.1 | Development of privacy-aware models and measures | | |
T2.2 | Adopting and enhancing adaptive security for system of systems | | |
T2.3 | Formal technologies for semantic provability | | |
T22.1 | Technology Lines | | |
T24.1 | Cloud Integration | | |
T28.1 | Cloud Integration | | |
T3.1 | Requirements Cloud Integration | | |
T3.1 | Multi-metrics applied for application-driven infrastructures | | |
T3.2 | Security usability in IoT ecosystem | | |
T30.1 | Open Innovation and Stakeholder Engagement | | |
T30.3 | Implement an open innovation approach in SCOTT | | |
T4.1 | IoTSec ecosystem and industrial applicability | | |
T4.2 | Smart Grid security centre applicability, assessment, simulation and pilots | | |
T4.3 | Gap Analysis of security methods for critical infrastructures | | |
T8.1 | Managed Wireless for Smart Infrastructures | | |
T8.2 | Service enabling through SW routing | | |
T8.3 | Pilot implementations of novel services | | |
TC1.1 | | | |
TC1.2 | Village infrastructure in DRC | | |
TC2.1 | | | |
TC2.2 | | | |
TC3.1 | | | |
TC3.2 | | | |
TC4.1 | TC4.1 Phase B content | | |
TC4.2 | | | |
TC5.1 | | | |
TC5.2 | Sustainable business model for digital infrastructures | | |
TI-1 | Overall Project Managemet | | |
TI1.1 | Low-cost infrastructure for InfoIntenet | | |
TI1.2 | Pilot installation Kjeller | | |
TI2.1 | Health Application development | | |
TI2.2 | Creating interactivity for Health Videos | | |
TI3.1 | KPIs for digital inclusion | | |
TI3.2 | Technology and Business Aspects | | |
TI4.1 | | | |
TI4.2 | | | |
TT1.1 | Awareness on One Health | | |
TT1.2 | Sensitization on One Health through Apps and digital Content | | |
TT1.3 | Selection of villages in TZ | | |
TT2.1 | Infrastructure analysis | | |
TT2.2 | Roll-out of Internet in TZ | | |
TT3.1 | | | |
TT3.2 | Phase B specification | | |
TT4.1 | | | |
TT4.2 | | | |
TT5.1 | | | |
TT5.2 | Sustainable Business Model | | |