Difference between revisions of "Building InfoSpots"

From its-wiki.no
Jump to: navigation, search
(⌘ Connect to a regional competence center (RCC))
(⌘ Connect to a regional competence center (RCC))
 
Line 24: Line 24:
  
 
{{Building InfoSpots TOC}}  
 
{{Building InfoSpots TOC}}  
=⌘ Connect to a regional competence center (RCC) =
+
=⌘ Connect to a Regional Competence Center ([[RCC]]) =
 
* [[C1-Knowledge_Center|What is a regional competence center?]]
 
* [[C1-Knowledge_Center|What is a regional competence center?]]
* Contacts to RCC:  
+
* Contacts to [[RCC]]:  
 
** Kenya ([[AHERI]]),  
 
** Kenya ([[AHERI]]),  
 
** Tanzania (Dar es Salaam Institute of Technology- DIT, Dar es Salaam University, Dodomo University),  
 
** Tanzania (Dar es Salaam Institute of Technology- DIT, Dar es Salaam University, Dodomo University),  

Latest revision as of 10:36, 14 December 2021

Disclaimer: This compendium provides information on how to create a wireless Information Spot (InfoSpot). The compendium is foreseen for community members looking forward to establish access to Internet Internet in their community.

Building InfoSpots

Title
Building InfoSpots
Subtitle
Table-of-Content
Author
Josef Noll
Footer
Building InfoSpots
Subfooter
Basic Internet


⌘ How an InfoSpot works

  • What is an InfoSpot?  % InfoSpot: story telling bla bla
  • Equipments needed  % mast, antenna, SIM, LNCC, RPI/Server
  • Examples of InfoSpots  % inside and examples
  • Information for your community

⌘ How to establish an InfoSpot


Building InfoSpots
InfoSpot?
What is an InfoSpot?
Story
Electromagnetic Signals
Building InfoSpots

⌘ Connect to a Regional Competence Center (RCC)

⌘ Configuration of Devices

see: InfoSpot Configuration % register the devices

⌘ Preparation of Installation

  • receive the devices
  • purchase a SIM card
  • activate the SIM card, remove PIN code
  • establish the antenna; insert the SIM card
  • connect the cables
  • perform tests before going out into the field

⌘ Installation at the location

  • re-measure the direction of the mobile tower
  • perform the tests
  • organise an InfoMeeting with the community
  • create some pictures & provide a short story
  • send an Impact Report (after 3 month, 6 months, 12 months)