DigI:Contribution of BasicInternet to Visjon2030

From its-wiki.no

Jump to: navigation, search


DigI:Contribution of BasicInternet to Visjon2030

Title Contribution of BasicInternet to Visjon2030
Place ITS
Date, Time 2018/12/14, 1330-1500
Contact Person Josef.Noll
Participants Tewodros Aragie Kebede, Josef Noll
related to Project DigI
Keywords
this page was created by Special:FormEdit/Meeting, and can be edited by Special:FormEdit/Meeting/DigI:Contribution of BasicInternet to Visjon2030
Category:Meeting


Notes

Short summary on activities:

  • Input to UN High Level Panel on Digital Inclusion. Together with Partners 7 contributions were submitted
  1. Hovedbidrag: Internet Lite for All for Digital Inclusion and Societal Empowerment
  2. Network operator view (med Orange)
  3. Information Spots for Digital Inclusion
  4. Digital Health Promotion for Health education and digital literacy (med Centre for Global Health)
  5. Information Spots for digital inclusion
  6. Digital health videos in rural areas (med Global Health Media)
  7. Network Slicing for Digital Inclusion (med Telenor, OsloMet, Wolffia)
  8. Internet Lite as Catalyst for the Goals (med Pure Consulting)
  • Wisam, Josef og Arvid deltok på Energi seminar hos SANDS. I.o.m. at regjeringen øker støtte fra 2-4 milliarder NOK for fornybar energi så blir mulighet for energikontroll knyttet til en informasjonsspot et godt forretningskonsept.
  • Utstyr er tested og konfigurert, og er sendt til Tanzania (thanks to Maghsoud and Wisam)
  • Forskning.no var på besøk og laget en artikkel (blir publisert i disse dager)

Tewodros reiser til Ethiopia. Will discuss with the government the opportunities of Information Spots per village. Please see attached (Media:CoreBasicInternet.pdf) for information we need on health, edu, agri, entrep...

Upcoming Plans

  • Common vision towards Digital Inclusion, and value preparation to ITU-D, GSMA, G20 CwA, ...
  • LeapLearning integration of Wifi Info Spot
  • Integration with Patandi Teachers College (Mar/Apr2019)
  • High-level panel in TZ in Sep2019