IoTSec:WP4
From its-wiki.no
Revision as of 22:45, 10 August 2015 by Josef.Noll (Talk | contribs)
Security in IoT for Smart Grids | |||||||
---|---|---|---|---|---|---|---|
|
![]() |
WP4 - Security Centre
Deliverables in IoTSec:WP4
Title | Due month | Lead partner | Dissemination level | |
---|---|---|---|---|
D4.1.1 | Tech. rep.: Analysis of IoTSec ecosystem | M08 | NTNU | Restricted |
D4.2.1 | Outline of security centre (pres. and outline) | M12 | NCE Smart | Public |
D4.2.2 | Assessment of stakeholder needs for Smart Grid Security Centre | M24 | NCE Smart | Public |
D4.3.1 | Pres: Roadmap towards Smart Grid Security Services | M24 | NCE Smart | Public |
Partners in IoTSec:WP4
- T4.1 (Title IoTSec ecosystem and industrial applicability, Lead partner NCE Smart, Partner ITS, Ifi, NR, ESmart Systems, Fredrikstad Energi, SIMULA, NTNU, Glitre Energi Nett)
- T4.2 (Title Smart Grid security centre applicability, assessment, simulation and pilots, Lead partner NCE Smart, Partner ITS, Ifi, NR, ESmart Systems, NCE Smart, Movation, NTNU)
- T4.3 (Title Gap Analysis of security methods for critical infrastructures, Lead partner NR, Partner ITS, Ifi, NR, ESmart Systems, NCE Smart, Movation)
Tasks in IoTSec:WP4
- D4.1.1 (Tech. rep.: Analysis of IoTSec ecosystem, Lead partner NTNU)
- D4.2.1 (Outline of security centre (pres. and outline), Lead partner NCE Smart)
- D4.2.2 (Assessment of stakeholder needs for Smart Grid Security Centre, Lead partner NCE Smart)
- D4.3.1 (Pres: Roadmap towards Smart Grid Security Services, Lead partner NCE Smart)
- T4.1 (IoTSec ecosystem and industrial applicability, Lead partner NCE Smart, Partner ITS, Ifi, NR, ESmart Systems, Fredrikstad Energi, SIMULA, NTNU, Glitre Energi Nett, Objective This task will establish the industrial requirements, analyse the IoTSec ecosystem and ensure industrial applicability.)
- T4.2 (Smart Grid security centre applicability, assessment, simulation and pilots, Lead partner NCE Smart, Partner ITS, Ifi, NR, ESmart Systems, NCE Smart, Movation, NTNU, Objective This task will perform the detailed assessment of modules applicable for the Smart Grid Security Centre and the pre-industrial pilots)
- T4.3 (Gap Analysis of security methods for critical infrastructures, Lead partner NR, Partner ITS, Ifi, NR, ESmart Systems, NCE Smart, Movation, Objective This task will perform the Gap Analysis of security methods for critical infrastructures)
[[Task number::+]] [[Objective::+]]