Difference between revisions of "SCOTT:SCOTT Technical Board Meeting Paris2017"

From its-wiki.no

Jump to: navigation, search
(Topics)
(Presentations)
 
(One intermediate revision by one other user not shown)
Line 34: Line 34:
 
* the Building Blocks which are seen as additional value, but not implemented "yet"
 
* the Building Blocks which are seen as additional value, but not implemented "yet"
 
* Building Blocks which are obsolete for the specific use case
 
* Building Blocks which are obsolete for the specific use case
 +
 +
 +
The project main objectives (the approach)
 +
* SCOTT project objective 1: Achievement of BB23.A
 +
* SCOTT project objective 2: Achievement of BB23.B ·...
 +
* SCOTT project objective 47: Achievement of BB26.J
 +
  
 
== Presentations ==
 
== Presentations ==
 
* Presentation: Privacy Labelling, Security Metrics, Roadmap towards a more secure and privacy-aware society (30 min)
 
* Presentation: Privacy Labelling, Security Metrics, Roadmap towards a more secure and privacy-aware society (30 min)
  
{{Add_Presentation|28 Sep 2017}}
+
{{Add_Presentation|27 Sep 2017}}
  
 
<!--- change according to your project -->
 
<!--- change according to your project -->
 
{{SCOTT:ActionItems}}
 
{{SCOTT:ActionItems}}

Latest revision as of 18:58, 27 September 2017

SCOTT Technical Board Meeting Paris2017
Home Meetings Publications Student corner Factpage
English-Language-icon.png


SCOTT:SCOTT Technical Board Meeting Paris2017

Title SCOTT:SCOTT Technical Board Meeting Paris2017
Place Paris, at CDG airport. see e-mail from 28 August.
Date, Time 2017/09/27, 1000-1700
Contact Person Joachim Hillebrand
Participants Josef.Noll, Joachim Hillebrand, Werner Rom, Lukasz Szczygielski (GUT), Christian Johansen
related to Project SCOTT
Keywords
this page was created by Special:FormEdit/Meeting, and can be edited by Special:FormEdit/Meeting/SCOTT:SCOTT Technical Board Meeting Paris2017
Category:Meeting


Venue

Hotel Ibis Paris CDG Airport Roissypôle BP 11122, 95701 (exit Terminal 3)

Topics

Overview over the project

  • what industry needs is an overview presentation: "From an Internet Company to an IoT Company: What are the security challenges and how you can handle them"
  • overall vision/visibility of the project (from 16 independent sub-projects to coordinated impact on the European scale)
  • "main vision for use cases"
Relation between Building Blocks and Functionalities

Implementation of building blocks in WPs - who takes responsibility?

  • E.g. WP8 has 9 building blocks, and not even the lead partner is part of WP8,
  • WP11 - 27+ Building Blocks involved
  • We should have a future oriented description, and perhaps architecture, showing the need of the envisaged building blocks. If not, kick them out

Requirements

  • 600 requirements, for what? - what is the message we are giving out?
  • should be converted towards a hierarchical structure, e.g. high-level, detailed requirements
  • then low-level requirements for implementation
  • Building block requirements vs use case requirements (not consistently defined)

Solution(? - agreement needed)

  • Use case owner creates a drawing, identifying
  • the core demonstrational outcome, with included Building Blocks
  • the Building Blocks which are seen as additional value, but not implemented "yet"
  • Building Blocks which are obsolete for the specific use case


The project main objectives (the approach)

  • SCOTT project objective 1: Achievement of BB23.A
  • SCOTT project objective 2: Achievement of BB23.B ·...
  • SCOTT project objective 47: Achievement of BB26.J


Presentations

  • Presentation: Privacy Labelling, Security Metrics, Roadmap towards a more secure and privacy-aware society (30 min)



 PresenterPresentation FileKeywords
Privacy Labelling, Security Metrics and RoadmapJosef NollClick to OpenSCOTT


Open Action Items