DigI:TT2.2

From its-wiki.no

Revision as of 12:32, 17 September 2018 by Josef.Noll (Talk | contribs)

Jump to: navigation, search

T2.2 Roll-out of Internet

Task Title Roll-out of Internet in TZ
WP DigI:WP-T2
Lead partner NIMR
Leader
Contributors NIMR, BasicInternet, Ministry of Health in Tanzania, Sokoine University of Agriculture, UIO
edit this task

Objective

This task will support the roll-out of Phase A equipment in TZ

Category:Task


Deliverables in T2.2 Roll-out of Internet

Add Deliverable

Status

The overall objective of this task is to bring the roll-out to the villages. As defined in DigI:TT2.1, we have standardised on Mikrotik equipment for the pilot.

  1. . RBSXTR&R11e-LTE (European prices € 88,95)

2- RB921GS-5HPacD-15s => € 94.99 3- RBSXTsq5nd => € 31.95 4- RBwAPG-5HacT2HnD => € 57.70 5- RB960 => € 57 6- RB951 => € 31.6 7- RBD52G => € 49.34


Expected outcome

Infrastructure for TZ

Phase A:

  • 2 villages (Izazi and Mgoli) in Iringa districts are for HIV, TB and Cysticercosis (M04) -
    • Migoli: has TIGO 3G tower in the village, Latitude: -7.145672 | Longitude: 35.819636, Altitude: 717 meters
    • Izazi: 2G connection from Migoli tower (no 3G), Latitude: -7.23764 | Longitude: 35.720995, Altitude: 753 meters
  • one Village in Monduli (Selela) is for for Anthrax (M04)
    • Selela, Latitude: -3.210762 | Longitude: 35.947617, Altitude: 1043 meters, TIGO tower on the mountain 5-7 km away