Difference between revisions of "DigI:Project"

From its-wiki.no

Jump to: navigation, search
(Work in Congo (DRC))
Line 17: Line 17:
 
* [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages
 
* [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages
 
* [[DigI:WP-T2|WP-T2]] Pilot Phase A Tanzania<br/> ''Extending the network, providing (limited) content
 
* [[DigI:WP-T2|WP-T2]] Pilot Phase A Tanzania<br/> ''Extending the network, providing (limited) content
* [[DigI:WP-T3|WP-T3]] Phase A evaluations and Phase B Specifications<br/> ''lessons learned from  
+
* [[DigI:WP-T3|WP-T3]] Phase A evaluations and Phase B Specifications<br/> ''Lessons learned from phase A''
 
* [[DigI:WP-T4|WP-T4]] Pilot Phase B Tanzania<br/> ''Extending the reach and the services''
 
* [[DigI:WP-T4|WP-T4]] Pilot Phase B Tanzania<br/> ''Extending the reach and the services''
* [[DigI:WP-T5|WP-T5]] Tanzania Phase B evaluation and suggestions for sustainable operations<br/> ''transforming into sustainable access''
+
* [[DigI:WP-T5|WP-T5]] Tanzania Phase B evaluation and suggestions for sustainable operations<br/> ''Transformation into sustainable access''
  
 
==Work in Congo (DRC)==
 
==Work in Congo (DRC)==
* [[DigI:WP-C1|WP-C1]] Specifications for Congo (DRC)<br/> ''
+
* [[DigI:WP-C1|WP-C1]] Specifications for Congo (DRC)<br/> ''satellite access extension, service selection''
* [[DigI:WP-C2|WP-C2]] Pilot Phase A DRC<br/> ''
+
* [[DigI:WP-C2|WP-C2]] Pilot Phase A DRC<br/> ''Panu and Kano connect, community center services''
* [[DigI:WP-C3|WP-C3]] Phase A evaluations and Phase B Specifications<br/> ''
+
* [[DigI:WP-C3|WP-C3]] Phase A evaluations and Phase B Specifications<br/> ''Lessons learned from phase A
* [[DigI:WP-C4|WP-C4]] Pilot Phase B DRC<br/> ''
+
* [[DigI:WP-C4|WP-C4]] Pilot Phase B DRC<br/> ''Extension to 6 villages, services for education and communities''
* [[DigI:WP-C5|WP-C5]] DRC Phase B evaluation and suggestions for sustainable operations<br/> ''
+
* [[DigI:WP-C5|WP-C5]] DRC Phase B evaluation and suggestions for sustainable operations<br/> ''Transformation into sustainable access''

Revision as of 23:40, 18 January 2017

Digital Inclusion (DigI)
Home Overview connected Villages Tanzania Publications About us
English-Language-icon.png

Digital Inclusion - Project details

The goal of Digital Inclusion (DigI) ... read more at DigI:Summary under construction

The Project DigI is structured through 15 workpackages (WPs). The project is organised along 3 lines, being infrastructure (WP-Ix), and the pilots in Tanzania and DRC (WP-Tx, WP-Cx). The infrastructure related WPs address platform, access technology, content distribution, applications and services, and societal/business-related aspects. The specific pilots are structured along a timeline of specification, first phase pilots, evaluations and recommendations, second phase pilots, and finally the transfer towards sustainable business models for access to InfoInternet.

Gant Chart DigI.BasicInternet.no

Infrastructure related WPs

  • WP-I0 Overall Management
  • WP-I1 Information-Internet infrastructure
    cost-effective infrastructure (satellite or radio-link), BYOD, Tablets
  • WP-I2 InfoInternet - Content and Apps
    local content (Global Health Video), Health & EDU Content
  • WP-I3 Evaluation and Global Perspective
    KPI knowledge base, literacy, "lessons learned"
  • WP-I4 Dissemination and Exploitation
    Extending the reach, addressing IT, Politics, Worldbank

Work in Tanzania

  • WP-T1 Specifications for Tanzania
    Priority of content, selection of villages
  • WP-T2 Pilot Phase A Tanzania
    Extending the network, providing (limited) content
  • WP-T3 Phase A evaluations and Phase B Specifications
    Lessons learned from phase A
  • WP-T4 Pilot Phase B Tanzania
    Extending the reach and the services
  • WP-T5 Tanzania Phase B evaluation and suggestions for sustainable operations
    Transformation into sustainable access

Work in Congo (DRC)

  • WP-C1 Specifications for Congo (DRC)
    satellite access extension, service selection
  • WP-C2 Pilot Phase A DRC
    Panu and Kano connect, community center services
  • WP-C3 Phase A evaluations and Phase B Specifications
    Lessons learned from phase A
  • WP-C4 Pilot Phase B DRC
    Extension to 6 villages, services for education and communities
  • WP-C5 DRC Phase B evaluation and suggestions for sustainable operations
    Transformation into sustainable access