Difference between revisions of "Femto"

From its-wiki.no
Jump to: navigation, search
(Created page with "=Building the Quality Network for wireless and mobile Networks= == WPs for Femtocell == Coverage Security & Authentication * pass through, * "virtuell fixed network operator" ...")
 
(WPs for Femtocell)
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
=Building the Quality Network for wireless and mobile Networks=
+
=Building the Quality Network for Wireless and Mobile Services=
 +
answering the Verdikt call for BIP:
 +
Energy, ....
 +
Future Internet, Infrastructure, ...
  
 +
Intro:
 +
Growth of mobile data, PAD and other devices, need 700 MHz BW....
 +
 +
===Partners===
 +
Femtoforum: Nexia, DSL Partner, ICT Norway, Movation, CWI Norway, FFI, (Studiemøtet)
 +
 +
Financial support: (or contributing personal costs) NetworkNorway, Telenor, Netcom,... Ubiquisys, Altibox, ....
 +
 +
Supported by: NPT
 +
 +
===Challenges===
 +
* [[Research challenges]]
 +
 
== WPs for Femtocell ==
 
== WPs for Femtocell ==
Coverage
+
WP2 - Coverage (coverage & capacity!!)
 +
objective: providing high bandwidth with minimum network cost throughout Norway; proposing a frequency vs technology allocation based on theoretical analysis and practical measurements.
 +
* theoretical analysis (of what??)
 +
* practical measurements
 +
* stress testing
 +
* research challenges: 
  
Security & Authentication
+
WP3 - Security & Authentication
 
* pass through,  
 
* pass through,  
 
* "virtuell fixed network operator"
 
* "virtuell fixed network operator"
 
* non-encrypted information flow
 
* non-encrypted information flow
  
Quality of Service
+
WP4 - Quality Networks
 +
* Cognitive systems
 +
* Quality of Service  
 
* control service
 
* control service
  
Business models
+
WP5 - Business models
 
* customer subscription versus provision from  
 
* customer subscription versus provision from  
 
* macro network costs versus femto costs, OPEX and CAPEX
 
* macro network costs versus femto costs, OPEX and CAPEX
 
* eksempel: FFI as femto provider
 
* eksempel: FFI as femto provider
 
* børs versus management
 
* børs versus management
 +
 +
WP6 - Pilot
 +
* konseptutvikling  (bidrag fra FFI/Trondheim samarbeid - GNU software radio, Stig Frode, Torbjørn...)
 +
* pilot market analysis
 +
 +
WP7 - Exploitation and Dissemination
 +
* International partnership, Net!Works
 +
 +
== Budget ==
 +
* 4 MNOK med 40% støtte av Forksningsrådet(?)
 +
** (6 MNOK totalbudget) for å dekke 3 x 800 kNOK = 2.4 MNOK for Dr. Grad
 +
 +
Finansering
 +
* 20% arbeidskraft fra 4 bedrifter = 0.8 PY = 1.3 MNOK
 +
* 6 bedrifter til å støtte PhD utdannele med 100 kNOK/år i 3 år = 1.8 MNOK
 +
* (evtl. støtte fra UNIK 30% av PhD)
 +
* missing: 2.9 MNOK (with UNIK help missing 1 MNOK?)
 +
 +
Action:
 +
* Josef  - 1 page intro, focus, etc  (executvie summary)
 +
* Mushfiq - WPs, research challenges
 +
* Josef - Budget
 +
(first draft by Monday 31. January)

Latest revision as of 12:13, 29 January 2011

Building the Quality Network for Wireless and Mobile Services

answering the Verdikt call for BIP: Energy, .... Future Internet, Infrastructure, ...

Intro: Growth of mobile data, PAD and other devices, need 700 MHz BW....

Partners

Femtoforum: Nexia, DSL Partner, ICT Norway, Movation, CWI Norway, FFI, (Studiemøtet)

Financial support: (or contributing personal costs) NetworkNorway, Telenor, Netcom,... Ubiquisys, Altibox, ....

Supported by: NPT

Challenges

WPs for Femtocell

WP2 - Coverage (coverage & capacity!!) objective: providing high bandwidth with minimum network cost throughout Norway; proposing a frequency vs technology allocation based on theoretical analysis and practical measurements.

  • theoretical analysis (of what??)
  • practical measurements
  • stress testing
  • research challenges:

WP3 - Security & Authentication

  • pass through,
  • "virtuell fixed network operator"
  • non-encrypted information flow

WP4 - Quality Networks

  • Cognitive systems
  • Quality of Service
  • control service

WP5 - Business models

  • customer subscription versus provision from
  • macro network costs versus femto costs, OPEX and CAPEX
  • eksempel: FFI as femto provider
  • børs versus management

WP6 - Pilot

  • konseptutvikling (bidrag fra FFI/Trondheim samarbeid - GNU software radio, Stig Frode, Torbjørn...)
  • pilot market analysis

WP7 - Exploitation and Dissemination

  • International partnership, Net!Works

Budget

  • 4 MNOK med 40% støtte av Forksningsrådet(?)
    • (6 MNOK totalbudget) for å dekke 3 x 800 kNOK = 2.4 MNOK for Dr. Grad

Finansering

  • 20% arbeidskraft fra 4 bedrifter = 0.8 PY = 1.3 MNOK
  • 6 bedrifter til å støtte PhD utdannele med 100 kNOK/år i 3 år = 1.8 MNOK
  • (evtl. støtte fra UNIK 30% av PhD)
  • missing: 2.9 MNOK (with UNIK help missing 1 MNOK?)

Action:

  • Josef - 1 page intro, focus, etc (executvie summary)
  • Mushfiq - WPs, research challenges
  • Josef - Budget

(first draft by Monday 31. January)