Property:Wolffia contribution

From its-wiki.no
Jump to: navigation, search

This is a property of type Text.


Pages using the property "Wolffia contribution"

Showing 8 pages using this property.

W

WP03 +Wolffia (1 PM) * Requirements from use cases * Requirement on security for roaming and cloud integration  +
WP05 +Wolffia (1 PM) will contribute with requirements for configuration architectures, starting from the home bubble and extending towards other domains  +
WP08 +Wolffia will will carry out the implementation and testing of the connection between the Home bubble and the distributed cloud according to specific requirements on security, reliability, latency, mobility, roaming, etc. by making use of the Building Block 3.2.L Adaptable Network Slicing.  +, Woffia (6 PM) will carry out the implementation and testing of the connection between the Home bubble and the distributed cloud according to specific requirements on security, reliability, latency, mobility, roaming, etc. by making use of the Building Block 3.2.L Adaptable Network Slicing.  +
WP15 +<s>Wolffia (3 PM) will carry out the implementation and testing of the connection between the vehicle and the infrastructure according to specific requirements on security, reliability, latency, mobility, roaming, etc. by making use of the Building Block 3.2.L Adaptable Network Slicing.</s>moved to WP21  +
WP21 + Wolffia (3 PM) will specify and design the connection between the vehicle and the infrastructure according to specific requirements on security, reliability, latency, mobility, roaming, etc. by making use of the Building Block 3.2.L Adaptable Network Slicing. (moved from WP15)  +
WP24 +Wolffia (14 PM) * Remote Configuration of Infrastructure (2 PM)
 * Semantic Attribute Based Access Control (S-ABAC) (2 PM) 
* Adaptable Network Slicing (10 PM)  +
WP26 +Wolffia (4 PM) will contribute with requirements for configuration architectures, starting from the home bubble and extending towards other domains.  +
WP29 +Wolffia (1 PM) will contribute to the Dissemination and Exploitation activities of the project.  +