Difference between revisions of "Building InfoSpots"

From its-wiki.no
Jump to: navigation, search
(⌘ Configuration of Devices)
(⌘ Preparation of Installation)
Line 36: Line 36:
  
 
=⌘ Preparation of Installation =
 
=⌘ Preparation of Installation =
% receive the devices
+
* receive the devices
% purchase a SIM card
+
* purchase a SIM card
% activate the SIM card, remove PIN code  
+
* activate the SIM card, remove PIN code  
% establish the antenna; insert the SIM card
+
* establish the antenna; insert the SIM card
% connect the cables
+
* connect the cables
% perform tests before going out into the field
+
* perform tests before going out into the field
  
 
=⌘ Installation at the location =
 
=⌘ Installation at the location =

Revision as of 15:05, 9 December 2021

Disclaimer: This compendium provides information on how to create a wireless Information Spot (InfoSpot). The compendium is foreseen for community members looking forward to establish access to Internet Internet in their community.

Building InfoSpots

Title
Building InfoSpots
Subtitle
Table-of-Content
Author
Josef Noll
Footer
Building InfoSpots
Subfooter
Basic Internet


⌘ How an InfoSpot works

  • What is an InfoSpot?  % InfoSpot: story telling bla bla
  • Equipments needed  % mast, antenna, SIM, LNCC, RPI/Server
  • Examples of InfoSpots  % inside and examples
  • Information for your community

⌘ How to establish an InfoSpot


Building InfoSpots
InfoSpot?
What is an InfoSpot?
Story
Electromagnetic Signals
Building InfoSpots

⌘ Connect to a regional competence center (RCC)

  • What is a regional competence center?
  • Contacts to RCC
  • Due Dilligence: who is installing, registered entity, team
  • Device Ordering
  • register the place for the InfoSpot
  • identify the mobile operator

⌘ Configuration of Devices

see: InfoSpot Configuration % register the devices

⌘ Preparation of Installation

  • receive the devices
  • purchase a SIM card
  • activate the SIM card, remove PIN code
  • establish the antenna; insert the SIM card
  • connect the cables
  • perform tests before going out into the field

⌘ Installation at the location

  • re-measure the direction of the mobile tower
  • perform the tests
  • organise an InfoMeeting with the community
  • create some pictures & provide a short story
  • send an Impact Report (after 3 month, 6 months, 12 months)