Difference between revisions of "DigI:TI1.2"

From its-wiki.no

Jump to: navigation, search
(Created page with "{{Task |Title=Pilot installation Kjeller |Page Title=T1.2 Pilot installation Kjeller |Workpackage=DigI:WP-I1 |Lead partner=Basic Internet Foundation |Partner=BasicInternet, |O...")
(No difference)

Revision as of 14:23, 18 May 2017

T1.2 Pilot installation Kjeller

Task Title Pilot installation Kjeller
WP DigI:WP-I1
Lead partner Basic Internet Foundation
Leader
Contributors BasicInternet
edit this task

Objective

This task will establish the Pilot installation in Africa

  • solar-cell driven Wifi access point
  • link to "tower" containing local content
  • installation report
Category:Task


Deliverables in T1.2 Pilot installation Kjeller

Add Deliverable


Expected outcome

Year 1:

  • Pilot installation (M06)
  • Suggestion for installation (M08)

Pilot installation at Kjeller

Infrastructure

  • 2 Solar panels (53 x 35 cm each, 6W specification, Biltema = 2 x 349 NOK)
  • 1 controller (Biltema - 199 NOK)
  • 1 Battery 12V 18AH
  • Cables and connectors
  • USB connector