Difference between revisions of "DigI:Project"
From its-wiki.no
Josef.Noll (Talk | contribs) (→Work in Congo (DRC)) |
Josef.Noll (Talk | contribs) |
||
Line 17: | Line 17: | ||
* [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages | * [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages | ||
* [[DigI:WP-T2|WP-T2]] Pilot Phase A Tanzania<br/> ''Extending the network, providing (limited) content | * [[DigI:WP-T2|WP-T2]] Pilot Phase A Tanzania<br/> ''Extending the network, providing (limited) content | ||
− | * [[DigI:WP-T3|WP-T3]] Phase A evaluations and Phase B Specifications<br/> '' | + | * [[DigI:WP-T3|WP-T3]] Phase A evaluations and Phase B Specifications<br/> ''Lessons learned from phase A'' |
* [[DigI:WP-T4|WP-T4]] Pilot Phase B Tanzania<br/> ''Extending the reach and the services'' | * [[DigI:WP-T4|WP-T4]] Pilot Phase B Tanzania<br/> ''Extending the reach and the services'' | ||
− | * [[DigI:WP-T5|WP-T5]] Tanzania Phase B evaluation and suggestions for sustainable operations<br/> '' | + | * [[DigI:WP-T5|WP-T5]] Tanzania Phase B evaluation and suggestions for sustainable operations<br/> ''Transformation into sustainable access'' |
==Work in Congo (DRC)== | ==Work in Congo (DRC)== | ||
− | * [[DigI:WP-C1|WP-C1]] Specifications for Congo (DRC)<br/> '' | + | * [[DigI:WP-C1|WP-C1]] Specifications for Congo (DRC)<br/> ''satellite access extension, service selection'' |
− | * [[DigI:WP-C2|WP-C2]] Pilot Phase A DRC<br/> '' | + | * [[DigI:WP-C2|WP-C2]] Pilot Phase A DRC<br/> ''Panu and Kano connect, community center services'' |
− | * [[DigI:WP-C3|WP-C3]] Phase A evaluations and Phase B Specifications<br/> '' | + | * [[DigI:WP-C3|WP-C3]] Phase A evaluations and Phase B Specifications<br/> ''Lessons learned from phase A |
− | * [[DigI:WP-C4|WP-C4]] Pilot Phase B DRC<br/> '' | + | * [[DigI:WP-C4|WP-C4]] Pilot Phase B DRC<br/> ''Extension to 6 villages, services for education and communities'' |
− | * [[DigI:WP-C5|WP-C5]] DRC Phase B evaluation and suggestions for sustainable operations<br/> '' | + | * [[DigI:WP-C5|WP-C5]] DRC Phase B evaluation and suggestions for sustainable operations<br/> ''Transformation into sustainable access'' |
Revision as of 23:40, 18 January 2017
Digital Inclusion (DigI) | |||||||
---|---|---|---|---|---|---|---|
|
Contents
Digital Inclusion - Project details
The goal of Digital Inclusion (DigI) ... read more at DigI:Summary under construction
The Project DigI is structured through 15 workpackages (WPs). The project is organised along 3 lines, being infrastructure (WP-Ix), and the pilots in Tanzania and DRC (WP-Tx, WP-Cx). The infrastructure related WPs address platform, access technology, content distribution, applications and services, and societal/business-related aspects. The specific pilots are structured along a timeline of specification, first phase pilots, evaluations and recommendations, second phase pilots, and finally the transfer towards sustainable business models for access to InfoInternet.
- WP-I0 Overall Management
- WP-I1 Information-Internet infrastructure
cost-effective infrastructure (satellite or radio-link), BYOD, Tablets - WP-I2 InfoInternet - Content and Apps
local content (Global Health Video), Health & EDU Content - WP-I3 Evaluation and Global Perspective
KPI knowledge base, literacy, "lessons learned" - WP-I4 Dissemination and Exploitation
Extending the reach, addressing IT, Politics, Worldbank
Work in Tanzania
- WP-T1 Specifications for Tanzania
Priority of content, selection of villages - WP-T2 Pilot Phase A Tanzania
Extending the network, providing (limited) content - WP-T3 Phase A evaluations and Phase B Specifications
Lessons learned from phase A - WP-T4 Pilot Phase B Tanzania
Extending the reach and the services - WP-T5 Tanzania Phase B evaluation and suggestions for sustainable operations
Transformation into sustainable access
Work in Congo (DRC)
- WP-C1 Specifications for Congo (DRC)
satellite access extension, service selection - WP-C2 Pilot Phase A DRC
Panu and Kano connect, community center services - WP-C3 Phase A evaluations and Phase B Specifications
Lessons learned from phase A - WP-C4 Pilot Phase B DRC
Extension to 6 villages, services for education and communities - WP-C5 DRC Phase B evaluation and suggestions for sustainable operations
Transformation into sustainable access