Difference between revisions of "IoTSec:WP1"
From its-wiki.no
Josef.Noll (Talk | contribs) (Created page with "=[[Workpackage::{{PAGENAME}}]] - Project Management = ==Deliverables in {{PAGENAME}} == {{#ask: [[Workpackage::{{PAGENAME}}]] Deliverable::+ | ?Title | ?Due month | ?Le...") |
|||
(12 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | =[[Workpackage::{{ | + | {{#set:Page Link=[[{{FULLPAGENAME}}|{{{BASEPAGENAME|}}}]]}} |
+ | {{TOCright}} | ||
+ | ={{PAGENAME}} - Semantic Descriptions = | ||
+ | ==Partners in {{PAGENAME}}== | ||
+ | {{#ask: [[Workpackage::{{FULLPAGENAME}}]] [[Partner::+]]| ?Page Title |?Lead partner | ?Partner | format=template | template=Partner_listing | ||
+ | }} | ||
+ | == Tasks in {{PAGENAME}} == | ||
+ | {{#ask:[[Workpackage::{{FULLPAGENAME}}]] [[Category:Task]]| ?Title= | ?Objective |?has result |?has subtask | format=template | template=Task_listing}} | ||
− | ==Deliverables in {{ | + | ==Deliverables in {{FULLPAGENAME}} == |
− | {{#ask: [[Workpackage::{{ | + | {{#ask: [[Workpackage::{{FULLPAGENAME}}]] [[Deliverable::+]] |
| ?Title | | ?Title | ||
| ?Due month | | ?Due month | ||
Line 10: | Line 17: | ||
}} | }} | ||
− | == | + | == Working area == |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | === Common Vocabulary === | |
+ | The IoTSec partners are constantly keeping a [[IoTSec:Common_Vocabulary|Common Vocabulary]] with terminology from across all WPs. | ||
[[Category:Workpackage]] | [[Category:Workpackage]] |
Latest revision as of 15:28, 19 December 2015
Security in IoT for Smart Grids | |||||||
---|---|---|---|---|---|---|---|
|
WP1 - Semantic Descriptions
Partners in WP1
Tasks in WP1
T1.1 Semantic description of infrastructure, attack detection, system view
- Objective: This task will create the semantic descriptions for the infrastructure components and the attack surface, and thus establish the semantic model for the IoT System
- Expected results: a minimum of 3 papers, including one journal paper (M12-36), the completion of a PhD candidate within the project period (M48), a non-trivial case study (M12)
- Subtasks:
T1.2 Measurable: security, privacy and dependability, metrics
- Objective: This task will establish the Multi-Metrics Model for the Smart Grid use case. The task includes
- the adaptation to the real world infrastructure
- the analysis of the most relevant sub-systems
- application specific goals for security, privacy and dependability
- Expected results: System analysis for main sub-systems on current infrastructure (M12), identification of 3-5 use cases, to be further elaborated in T3.1 (M12), Feedback from industry on applicability of system analysis (M12), Extension of the Smart Grid system to include at least 2 new functionalities (M24), Identification of challenges for industrial applicability (M24)
- Subtasks:
Deliverables in IoTSec:WP1
Title | Due month | Lead partner | Dissemination level | |
---|---|---|---|---|
D1.1.1 | Semantic Description of Infrastructure | M12 | Ifi | Public |
D1.1.2 | Semantic Description of Infrastructure (final) | M24 | Ifi | Public |
D1.2.1 | Methods for measurable security (draft) | M12 | ITS | Public |
D1.2.2 | Methods for measurable security (final) | M24 | ITS | Public |
Working area
Common Vocabulary
The IoTSec partners are constantly keeping a Common Vocabulary with terminology from across all WPs.