Difference between revisions of "DigI:Project"
From its-wiki.no
Josef.Noll (Talk | contribs) |
Josef.Noll (Talk | contribs) (→Infrastructure related WPs) |
||
Line 11: | Line 11: | ||
* [[DigI:WP-I1|WP-I1]] Information-Internet infrastructure<br/> ''cost-effective infrastructure (satellite or radio-link), BYOD, Tablets'' | * [[DigI:WP-I1|WP-I1]] Information-Internet infrastructure<br/> ''cost-effective infrastructure (satellite or radio-link), BYOD, Tablets'' | ||
** [[DigI:TI1.1|Task TI1.1]] Low-cost infrastructure for InfoInternet | ** [[DigI:TI1.1|Task TI1.1]] Low-cost infrastructure for InfoInternet | ||
− | ** [[DigI:TI1. | + | ** [[DigI:TI1.2|Task TI1.2]] Pilot installation Kjeller |
* [[DigI:WP-I2|WP-I2]] InfoInternet - Content and Apps<br/> ''local content ([https://globalhealthmedia.org/videos/ Global Health Video]), Health & EDU Content'' | * [[DigI:WP-I2|WP-I2]] InfoInternet - Content and Apps<br/> ''local content ([https://globalhealthmedia.org/videos/ Global Health Video]), Health & EDU Content'' | ||
** [[DigI:TI2.1|Task TI2.1]] Health Application development | ** [[DigI:TI2.1|Task TI2.1]] Health Application development | ||
Line 21: | Line 21: | ||
** [[DigI:TI4.1|Task TI4.1]] Publications, Presentations | ** [[DigI:TI4.1|Task TI4.1]] Publications, Presentations | ||
** [[DigI:TI4.2|Task TI4.2]] Showcase material | ** [[DigI:TI4.2|Task TI4.2]] Showcase material | ||
+ | |||
==Work in Tanzania== | ==Work in Tanzania== | ||
* [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages | * [[DigI:WP-T1|WP-T1]] Specifications for Tanzania<br/> ''Priority of content, selection of villages |
Revision as of 12:43, 6 June 2017
Digital Inclusion (DigI) | |||||||
---|---|---|---|---|---|---|---|
|
Digital Inclusion - Project details
under construction
The Project DigI is structured through 15 workpackages (WPs). The project is organised along 3 lines, being infrastructure (WP-Ix), and the pilots in Tanzania and DRC (WP-Tx, WP-Cx). The infrastructure related WPs address platform, access technology, content distribution, applications and services, and societal/business-related aspects. The specific pilots are structured along a timeline of specification, first phase pilots, evaluations and recommendations, second phase pilots, and finally the transfer towards sustainable business models for access to InfoInternet.
- WP-I0 Overall Management
- WP-I1 Information-Internet infrastructure
cost-effective infrastructure (satellite or radio-link), BYOD, Tablets- Task TI1.1 Low-cost infrastructure for InfoInternet
- Task TI1.2 Pilot installation Kjeller
- WP-I2 InfoInternet - Content and Apps
local content (Global Health Video), Health & EDU Content- Task TI2.1 Health Application development
- Task TI2.2 Creating interactivity for Health Videos
- WP-I3 Evaluation and Global Perspective
KPI knowledge base, literacy, "lessons learned"- Task TI3.1 KPIs for digital inclusion
- Task TI3.2 Related Initiatives
- WP-I4 Dissemination and Exploitation
Extending the reach, addressing IT, Politics, Worldbank- Task TI4.1 Publications, Presentations
- Task TI4.2 Showcase material
Work in Tanzania
- WP-T1 Specifications for Tanzania
Priority of content, selection of villages- Task TT1.1 Awareness on One Health
- Task TT1.2 Sensitization on One Health through Apps and digital Content
- Task TT1.3 Selection of villages in TZ
- WP-T2 Pilot Phase A Tanzania
Extending the network, providing (limited) content- Task TT2.1 Infrastructure analysis
- Task TT2.2 Roll-out of Internet
- WP-T3 Phase A evaluations and Phase B Specifications
Lessons learned from phase A- Task TT3.1 Phase A evaluation
- Task TT3.2 Phase B specifications
- WP-T4 Pilot Phase B Tanzania
Extending the reach and the services- DigI:TT4.1Task TT4.1 Phase B content
- Task TT4.2 Extending the reach in TZ
- WP-T5 Tanzania Phase B evaluation and suggestions for sustainable operations
Transformation into sustainable access- Task TT5.1 Phase B evaluation
- Task TT5.2 Sustainable business model for health information
Work in Congo (DRC)
- WP-C1 Specifications for Congo (DRC)
satellite access extension, service selection- Task TC1.1 Specifications for the digital ecosystem
- Task TC1.2 Villages infrastructure in Panu and Kano
- WP-C2 Pilot Phase A DRC
Panu and Kano connect, community center services- Task TC2.1 Infrastructure analysis
- Task TC2.2 Roll-out of Internet
- WP-C3 Phase A evaluations and Phase B Specifications
Lessons learned from phase A- Task TC3.1 Phase A evaluation
- Task TC3.2 Phase B specifications
- WP-C4 Pilot Phase B DRC
Extension to 6 villages, services for education and communities- Task TC4.1 Phase B content
- Task TC4.2 Extending the reach in DRC
- WP-C5 DRC Phase B evaluation and suggestions for sustainable operations
Transformation into sustainable access- Task TC5.1 Phase B evaluation, service update
- Task TC5.2 Sustainable business model for digital infrastructures