Difference between revisions of "SCOTT:WP02"
From its-wiki.no
Josef.Noll (Talk | contribs) |
Josef.Noll (Talk | contribs) |
||
Line 4: | Line 4: | ||
|Project=SCOTT | |Project=SCOTT | ||
|Lead partner=Nokia | |Lead partner=Nokia | ||
− | |Partner=NOKIA, VIF, AVL, CENTRIA, CISC, CIT, EAB, FSC, TECNALIA, IK4-TEKNIKER, INDRA, ITI, INTEGRASYS, JKU, Klas Telecom, LCM, MGEP, PRE, GUT, RD VELHO, SBA, Tyco, UCC, UiO, UPM, VEMCO | + | |Leader=Josef.Noll |
+ | |Partner=NOKIA, VIF, AVL, CENTRIA, CISC, CIT, EAB, FSC, TECNALIA, IK4-TEKNIKER, INDRA, ITI, INTEGRASYS, JKU, Klas Telecom, LCM, MGEP, PRE, GUT, RD VELHO, SBA, Tyco, UCC, UiO, UPM, VEMCO SP ZOO, | ||
|Objective=The objective of WP2 is to collect, analyse and consolidate SCOTT requirements related to the Technology Line “Security and Safety”. Work will follow the requirements process as defined in WP1, and consider requirements arising from high-level objectives and business needs, as well as from use cases (SP2) utilizing building blocks of the Technology Line “Security and Safety”. Given the scope of this Technology Line, by nature a strong link to WP28 (Framework for Building Trusted Systems) is expected. | |Objective=The objective of WP2 is to collect, analyse and consolidate SCOTT requirements related to the Technology Line “Security and Safety”. Work will follow the requirements process as defined in WP1, and consider requirements arising from high-level objectives and business needs, as well as from use cases (SP2) utilizing building blocks of the Technology Line “Security and Safety”. Given the scope of this Technology Line, by nature a strong link to WP28 (Framework for Building Trusted Systems) is expected. | ||
}} | }} |
Revision as of 19:34, 19 June 2017
WP2 - Requirements on Security & Safety
WP Title: | Requirements on Security & Safety |
---|---|
Project: | SCOTT |
Lead partner: | Nokia |
Leader: | Josef.Noll |
Contributors: | NOKIA, VIF, AVL, CENTRIA, CISC, CIT, EAB, FSC, TECNALIA, IK4-TEKNIKER, INDRA, ITI, INTEGRASYS, JKU, Klas Telecom, LCM, MGEP, PRE, GUT, RD VELHO, SBA, Tyco, UCC, UiO, UPM, VEMCO SP ZOO |
Objective
The objective of WP2 is to collect, analyse and consolidate SCOTT requirements related to the Technology Line “Security and Safety”. Work will follow the requirements process as defined in WP1, and consider requirements arising from high-level objectives and business needs, as well as from use cases (SP2) utilizing building blocks of the Technology Line “Security and Safety”. Given the scope of this Technology Line, by nature a strong link to WP28 (Framework for Building Trusted Systems) is expected.