WP28 - Building Trusted Systems
WP Title: | Framework Building Trusted Systems |
---|---|
Project: | SCOTT |
Lead partner: | VIF |
Leader: | Peter Mörtl |
Contributors: | VIF, ACCIONA, AVL, CIT, EMBRAER, Eye Networks AS, FSC, INDRA, ISEP, INTEGRASYS, JIG.ES, Klas Telecom, KTH, PRE, GUT, VTT, Tyco, UCC, VEMCO SP ZOO |
Objective
This work package covers the development, application, testing, and refinement of a methodological approach to engineer a trusted system, explicitly considering also non-technical factors including psychological, social, and work contextual factors. To achieve standardization of how trust is addressed across use cases as well as to increase applicability and general utility of results from SCOTT for other additional domains and areas beyond the represented use cases, an integrated framework for the development of trusted systems will be derived by adapting existing guidance , see Figure 86.
The WP is structured in 3 tasks that follow the framework: Task 1 Problem Definition, Task 2 Solution Development and Realization, and Task 3 Trustworthiness Assessment.
Partners in WP28
- T28.1 Building Trust Systems (Virtual Vehicle Research Center, Movation, Virtual Vehicle Research Center)
Tasks in WP28
T28.1 Cloud Integration
- Objective: This task will address trust issues in building blocks and use cases
- Expected results: table of trust parameter (M04), selection of trust parameters for selected building blocks (M34)
- Subtasks:
SCOTT-NO contact: Josef Noll
EyeSaaS (5 PM) will refine the use case “Managed Wireless for Smart Infrastructure” to describe the operational and environmental characteristics of use. An appropriate trust manager will be appointed to implement the SCOTT framework with, as needed, the help of computer interaction designers, human factors, and psychologists to contextualize the trust factors and help derive trust objectives and trust requirements that will enable the actual building of trust for this use case. EyeSaas will monitor these trust requirements throughout the implementation phase. EyeSaas will develop assurance cases that allow to demonstrate trustworthiness of the technologies and document them through analytical and/or empirical means.
Movation (0 PM) lead the work on Deliverable D28.3. Note: neither contribution nor manpower defined
Current status
WP Lead Peter Mörtl (VIF), core focus: on Key Use Cases (WP6/9/11/20/21)
phone meeting 20Sep2017
e2e operational scenario regarding "trust" by each WP leader. The minutes and details can be found under: https://projects.avl.com/16/0094/WP01/_layouts/15/WopiFrame.aspx?sourcedoc=/16/0094/WP01/Documents/02_Meetings%20and%20WebEx/Meetings%20and%20Calls%202017/SCOTT%20SP1%20Webex_20170921.pptx&action=default
Phone conf 13Jun2017
- identified trust factors
- establishing a trust framework, asking every use case owner to add (overdoing?)
- Word document for framework: https://projects.avl.com/16/0094/WP28/Documents/WP28_1_1%20Template%20Draft%2004.doc?Web=1
Deliverables in SCOTT:WP28
Title | Due month | Lead partner | Editor | Dissemination level | |
---|---|---|---|---|---|
D28.3 | Use Case Vulnerabilities | M12 | Virtual Vehicle Research Center | Confidential |
Working area
Trust support
- need to do a Semantic translation", e.g. WP7...WP21 (major trust factor, trust factor, minor trust factor - crosses)
- from DoW pp507-508