Difference between revisions of "IoTSec:T4.1"

From its-wiki.no

Jump to: navigation, search
Line 9: Line 9:
  
 
= Subtasks in T4.1 =
 
= Subtasks in T4.1 =
== T4.1.1 IoTSec ecosystem ==
+
== [[has subtask::T4.1.1 IoTSec ecosystem]] ==
 
An IoTSec ecosystem defines the stakeholders linked ....
 
An IoTSec ecosystem defines the stakeholders linked ....
  
Line 15: Line 15:
  
 
Results:   
 
Results:   
* A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection.  Also, a clarification of what is considered to be outside the system boundary.
+
* [[has result::A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection (M08)]]
 +
* [[has result::A clarification of what is considered to be outside of the research and industrial applicability (M12)]].
  
 
Partners:  
 
Partners:  
Line 23: Line 24:
 
* Technical report
 
* Technical report
  
== T4.1.2 Industrial network ==  
+
== [[has subtask::T4.1.2 Industrial network]] ==  
  
 
Objective: The main objective of this subtask is to establish industrial network, through which research results can be developed further to new business opportunities.The industrial network will be based on members of the NCE Smart Energy Markets cluster and will consist of distribution grid operators (DSOs), operators of communication networks between end-users, DSOs and the Norwegian el-hub, and technology providers for the energy sector. As secondary objects feedback for subtask 4.1.1 is provided by industrial network and core stakeholders are involved for activities in task 4.2
 
Objective: The main objective of this subtask is to establish industrial network, through which research results can be developed further to new business opportunities.The industrial network will be based on members of the NCE Smart Energy Markets cluster and will consist of distribution grid operators (DSOs), operators of communication networks between end-users, DSOs and the Norwegian el-hub, and technology providers for the energy sector. As secondary objects feedback for subtask 4.1.1 is provided by industrial network and core stakeholders are involved for activities in task 4.2
  
Results: Industrial network established and actively involved in the project.
+
'''Results:'''
 +
* [[has result::Industrial network enhanced by at least 4 members (M12)]]
 +
* [[has result::Established Industrial workshop and defined industrial shareholder involvement in the project (in collaboration with T0.2 - M18)]].
  
 
Deliverables: List of stakeholders in the industrial network
 
Deliverables: List of stakeholders in the industrial network
 
== T4.1.1 Industrial applicability ==
 
''Josef/Iñaki to update:'' industrial testbeds, e.g. Basic Internet testbed for IoTSec devices
 

Revision as of 18:24, 30 August 2015

Security in IoT for Smart Grids
Home Research Security Centre Publications Student corner About
English-Language-icon.png

T4.1 IoTSec ecosystem

Task Title IoTSec ecosystem and industrial applicability
WP IoTSec:WP4
Lead partner NCE Smart
Leader
Contributors HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula
edit this task

Objective

This task will establish the industrial requirements, analyse the IoTSec ecosystem and ensure industrial applicability.

Category:Task


Deliverables in T4.1 IoTSec ecosystem

 TitleDue monthLead partnerEditorDissemination level
D4.1.1Tech. rep.: Analysis of IoTSec ecosystemM08NTNUEinar SnekkenesRestricted

Add Deliverable


Subtasks in T4.1

T4.1.1 IoTSec ecosystem

An IoTSec ecosystem defines the stakeholders linked ....

The objective of this subtask is to provide a common world view to ensure that those that do the research work produce results that are relevant, interesting and important to the industrial partners, and that the research partners have clearly defined ‘interfaces’ – i.e. use cases and scenarios. By ensuring that the project have a commonly understood world view of interest, we establish a solid foundation for the integration of project results.

Results:

  • A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection (M08)
  • A clarification of what is considered to be outside of the research and industrial applicability (M12).

Partners:

  • NCE Smart, HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula

Deliverables:

  • Technical report

T4.1.2 Industrial network

Objective: The main objective of this subtask is to establish industrial network, through which research results can be developed further to new business opportunities.The industrial network will be based on members of the NCE Smart Energy Markets cluster and will consist of distribution grid operators (DSOs), operators of communication networks between end-users, DSOs and the Norwegian el-hub, and technology providers for the energy sector. As secondary objects feedback for subtask 4.1.1 is provided by industrial network and core stakeholders are involved for activities in task 4.2

Results:

  • Industrial network enhanced by at least 4 members (M12)
  • Established Industrial workshop and defined industrial shareholder involvement in the project (in collaboration with T0.2 - M18).

Deliverables: List of stakeholders in the industrial network