Difference between revisions of "IoTSec:T4.1"

From its-wiki.no

Jump to: navigation, search
(T4.1.1 IoTSec ecosystem)
(elHub information)
 
(16 intermediate revisions by 5 users not shown)
Line 4: Line 4:
 
|Workpackage=IoTSec:WP4
 
|Workpackage=IoTSec:WP4
 
|Lead partner=NCE Smart
 
|Lead partner=NCE Smart
|Partner=UNIK, Ifi, NR, ESmart Systems,
+
|Partner=HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula
 
|Objective=This task will establish the industrial requirements, analyse the IoTSec ecosystem and ensure industrial applicability.
 
|Objective=This task will establish the industrial requirements, analyse the IoTSec ecosystem and ensure industrial applicability.
 
}}
 
}}
 
 
= Subtasks in T4.1 =
 
= Subtasks in T4.1 =
== T4.1.1 IoTSec ecosystem ==
+
== [[has subtask::T4.1.1 IoTSec ecosystem]] ==
''note: copied from [[IoTSec:T3.2|T3.2]]'' - should only appear once
+
An IoTSec ecosystem defines the stakeholders linked ....
  
The objective of this subtask is to provide a common world view to ensure that those that do the research work produce results that are relevant, interesting and important to the industrial partners, and that the research partners have clearly defined ‘interfaces’ – i.e. cases and scenarios.  By ensuring that the project have a commonly understood world view of interest, we establish a solid foundation for the integration of project results.  
+
The objective of this subtask is to provide a common world view to ensure that those that do the research work produce results that are relevant, interesting and important to the industrial partners, and that the research partners have clearly defined ‘interfaces’ – i.e. use cases and scenarios.  By ensuring that the project have a commonly understood world view of interest, we establish a solid foundation for the integration of project results .  
  
 
Results:   
 
Results:   
* A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection.  Also, a clarification of what is considered to be outside the system boundary.
+
* [[has result::A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection (M08)]]
 +
* [[has result::A clarification of what is considered to be outside of the research and industrial applicability (M12)]].
  
 
Partners:  
 
Partners:  
* HIG, NCE, + everybody?
+
* NCE Smart, HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula
  
 
Deliverables:  
 
Deliverables:  
 
* Technical report
 
* Technical report
  
== T4.1.2 Industrial applicability ==
+
== [[has subtask::T4.1.2 Industrial network]] ==  
''Josef/Iñaki to update:'' industrial testbeds, e.g. Basic Internet testbed for IoTSec devices
+
 
 +
Objective: The main objective of this subtask is to establish industrial network, through which research results can be developed further to new business opportunities.The industrial network will be based on members of the NCE Smart Energy Markets cluster and will consist of distribution grid operators (DSOs), operators of communication networks between end-users, DSOs and the Norwegian el-hub, and technology providers for the energy sector. As secondary objects feedback for subtask 4.1.1 is provided by industrial network and core stakeholders are involved for activities in task 4.2
 +
 
 +
'''Results:'''
 +
* [[has result::Industrial network enhanced by at least 4 members (M12)]]
 +
* [[has result::Established Industrial workshop and defined industrial shareholder involvement in the project (in collaboration with T0.2 - M18)]].
 +
 
 +
Deliverables: List of stakeholders in the industrial network
 +
 
 +
= elHub information =
 +
Follow this link for information about [[http://elhub.no/nb/om-elhub/elhub-for-akt%C3%B8rer how elhub affects actors (Norwegian)]] in the energy value chain, including end-users.
 +
 
 +
Here you can find [[http://elhub.no/en/elhub general information about elhub (english)]], what it is and why it is being made, along with a nice 4min video explaining it all.

Latest revision as of 13:10, 29 March 2017

Security in IoT for Smart Grids
Home Research Security Centre Publications Student corner About
English-Language-icon.png

T4.1 IoTSec ecosystem

Task Title IoTSec ecosystem and industrial applicability
WP IoTSec:WP4
Lead partner NCE Smart
Leader
Contributors HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula
edit this task

Objective

This task will establish the industrial requirements, analyse the IoTSec ecosystem and ensure industrial applicability.

Category:Task


Deliverables in T4.1 IoTSec ecosystem

 TitleDue monthLead partnerEditorDissemination level
D4.1.1Tech. rep.: Analysis of IoTSec ecosystemM08NTNUEinar SnekkenesRestricted

Add Deliverable

Subtasks in T4.1

T4.1.1 IoTSec ecosystem

An IoTSec ecosystem defines the stakeholders linked ....

The objective of this subtask is to provide a common world view to ensure that those that do the research work produce results that are relevant, interesting and important to the industrial partners, and that the research partners have clearly defined ‘interfaces’ – i.e. use cases and scenarios. By ensuring that the project have a commonly understood world view of interest, we establish a solid foundation for the integration of project results .

Results:

  • A clearly defined scope of the project in terms of stakeholders, their interests, technological components and their functionality and interconnection (M08)
  • A clarification of what is considered to be outside of the research and industrial applicability (M12).

Partners:

  • NCE Smart, HiG, UNIK, Ifi, NR, ESmart Systems, EB Nett, Fredrikstad Energi, Simula

Deliverables:

  • Technical report

T4.1.2 Industrial network

Objective: The main objective of this subtask is to establish industrial network, through which research results can be developed further to new business opportunities.The industrial network will be based on members of the NCE Smart Energy Markets cluster and will consist of distribution grid operators (DSOs), operators of communication networks between end-users, DSOs and the Norwegian el-hub, and technology providers for the energy sector. As secondary objects feedback for subtask 4.1.1 is provided by industrial network and core stakeholders are involved for activities in task 4.2

Results:

  • Industrial network enhanced by at least 4 members (M12)
  • Established Industrial workshop and defined industrial shareholder involvement in the project (in collaboration with T0.2 - M18).

Deliverables: List of stakeholders in the industrial network

elHub information

Follow this link for information about [how elhub affects actors (Norwegian)] in the energy value chain, including end-users.

Here you can find [general information about elhub (english)], what it is and why it is being made, along with a nice 4min video explaining it all.